Pyes Pa Booster Station Electrical and Miscellaneous Mechanical Works Pyes Pa Booster Station Electrical and Miscellaneous Mechanical Works Read more
Te Maunga Waste Water Treatment Plant Grit Handling Upgrade & Various Miscellaneous Electrical Works Te Maunga Waste Water Treatment Plant Grit Handling Upgrade & Various Miscellaneous Electrical Works Read more
Sanctuary Point Waste Water Pump Station Electrical Works Sanctuary Point Waste Water Pump Station Electrical Works Read more
Gates Gates Gates SPIIND has manufactured a wide range of custom design automated and manual gates in a wide range of materials and finishes and we woudl be happy to discuss any specific requirements. Read more
Refining NZ FNZ6101 Convection Bank Replacement Refining NZ FNZ6101 Convection Bank Replacement Refining NZ FNZ6101 Convection Bank Replacement SPIIND was contracted by Refining NZ to fabricate and install two replacement FNZ 6101 Convection Bank Bundles. Read more
Auckland Ferry Terminal Pontoons Auckland Ferry Terminal Pontoons Auckland Ferry Terminal Pontoons SPIIND is currently building nine floating pontoon structures ranging in size up to 40m long x 16m wide and each weighing up to 175 Tonnes. These structures are being fabricated and assembled in SPIIND's Ruakaka workshop with some sub assemblies coming from SPIIND's Tauranga workshop. On completion of fabrication, the pontoons are transported to SPIIND's painting facility at Marsden Point before being transported and craned to the sea at Northport. The pontoons are then towed by sea to Auckland Queens Wharf where they are bolted together and final fitout is completed. When all in place the pontoons will form the new Auckland City Ferry Terminal Docking points and passenger loading platforms. Read more
Cambridge Pipe Bridge and Associated Piping Cambridge Pipe Bridge and Associated Piping Cambridge Pipe Bridge and Associated Piping Read more